NSEA-SR-158 (Danish North Sea)
CHALLENGE
The SSSV of the well of a major operator in the Danish North Sea had previously failed an inflow test and was reactivated by BLUESPARK® at that time. The SSSV was failing the inflow test again a year later and was believed to be in a stuck open position. It was decided to use BLUESPARK® again to clean scale from the SSSV to reactivate it.
SOLUTION
Remove scale from SSSV to restore functionality using electro-hydraulic pulsing technology.
- The BLUESPARK® 275 tool with Fluid Hold-Up Tool (FHUT) was run on third-party E-Line to the treatment interval 
- Two complete passes, a pass over the flow-tube, and a station at the flapper of the SSSV were completed in a treatment time of 11 hours 
- Camera images were obtained to compare to images made before the BLUESPARK® treatment 
CONDITIONS
- Offshore conventional oil field 
- CaCO3 scale 
- Depth: 1900 ft (580 m) 
- Temperature: 62 °C (144 °F) 
OUTCOME
- The SSSV was cleaned of CaCO3 scale and now passed the inflow test 
- Camera images confirmed that scale had been removed from the SSSV 
Before BLUESPARK® Treatment
After BLUESPARK® Treatment
Blue Spark Energy is paving the way towards a sustainable, dynamic oil & gas industry. As leaders in high-pulse powered wellbore remediations, we provide a revolutionary technology that is a safe, cost-effective, and efficient solution for forward-thinking energy providers.
 
                         
            