CHALLENGE

A major operator in Oman was encountering skin damage due to plugged perforations and gravel pack in their wells. The customer was looking for a cost effective alternative to remove the blockages and return the wells to a pre-damaged state.

SOLUTION

Improve connectivity to the reservoir clearing out blockages using electro-hydraulic stimulation technology.

  • The BLUESPARK® tool was run on third-party E-Line to the treatment interval of each of four wells.

  • An average of 21 m (69 ft) of interval was treated in each well with an operating time of 8 hours or less per run.

  • The wells were put back on production and monitored.

Blue+Spark+Energy+-+case+study+BLUESPARK%C2%AE+Cleans+Gravel+Pack+in+Oman+wells+MIDDLE+EAST

CONDITIONS

  • Depth: 1,000 m (3,300 ft)

  • Temperature: 55 °C (131 °F)

OUTCOME

  • The aggregate oil production for the first 30-days averaged 324 BOPD, up 970% from the pre-BLUESPARK® aggregate of 30.3 BOPD, including one well (Well #4) that had zero production pre-treatment.


Blue Spark Energy is paving the way towards a sustainable, dynamic oil & gas industry. As leaders in high-pulse powered wellbore remediations, we provide a revolutionary technology that is a safe, cost-effective, and efficient solution for forward-thinking energy providers.