60% production uplift, achieved in a day, instead of 5.

60% production uplift, achieved in a day, instead of 5.
A major operator in the Middle East was encountering skin damage in their wells. Normally, the customer would perform a matrix acidization treatment using coiled-tubing. The customer was looking for a cost effective alternative.

Improve connectivity to the reservoir clearing out blockages using electro-hydraulic stimulation technology.
A major operator in the Middle East was encountering skin damage in their wells. Normally, the customer would perform a matrix acidization treatment using coiled-tubing. The customer was looking for a cost effective alternative.