Four Oman wells with plugged gravel packs – aggregate production went from 30 to 324 barrels a day at 30-day measurement. A 970% increase.

Four Oman wells with plugged gravel packs – aggregate production went from 30 to 324 barrels a day at 30-day measurement. A 970% increase.
A major operator in Oman was encountering skin damage due to plugged perforations and gravel pack in their wells. The customer was looking for a cost effective alternative to remove the blockages and return the wells to a pre-damaged state.

Improve connectivity to the reservoir clearing out blockages using electro-hydraulic stimulation technology.