Two months after completion, oil production declined dramatically on this well. We returned it to production in less than half a day.

Two months after completion, oil production declined dramatically on this well. We returned it to production in less than half a day.

Oil production was lost two months after well completion resulting in only water being produced. As a low volume producer, a cost-effective solution, in conjunction with a workover, was initiated to remediate the well.
Improve connectivity to the reservoir by re-initiating worm holes using electro-hydraulic stimulation technology.