Acid effectiveness boosted, production increased 10-fold.

A mature oil-producing well had stopped responding to acid treatment. We doubled production and made subsequent acidization effective again (10x increase).

A mature oil-producing well had stopped responding to acid treatment. We doubled production and made subsequent acidization effective again (10x increase).

Oil production before BLUESPARK, after treatment and after subsequent acidizing, CS 104.

Challenge

The operator suspected damage in the near wellbore that was affecting the acid jobs. Due to the low production rate, the total cost of an intervention utilizing other stimulation technologies was deemed uneconomic.

Well Conditions

  • Vertical well
  • Permeability 7.3-10.2 mD
  • Consolidated limestone, sandstone, clay
  • Depth 2000 m (6500 ft)
  • Temperature 48 °C (118 °F)

Solution

Improve connectivity to the reservoir, using electro-hydraulic stimulation technology.

  • BLUESPARK® (Wireline Applied Stimulation Pulsing) technology was run on third-party wireline.
  • A 17 m (56 ft.) interval was stimulated in less than 8 hours on a single run.
  • The well was placed back on production, with an immediate increase in production observed.
  • The customer successfully reattempted a matrix acidizing stimulation, with excellent results.

Outcome

  • BLUESPARK® stimulation resulted in a doubling of production, from 3.5 to 7.3 BOPD, sustained for a month prior to the customer deciding to acidize.
  • Matrix acidizing subsequent to the BLUESPARK® treatment resulted in an over ten- fold increase in production to 40 BOPD, sustained for 90 days.