Matrix acidization had limited and short-lived effects on this mature well. We delivered a 96% production increase, with a 40% average uplift sustained for a year.

Matrix acidization had limited and short-lived effects on this mature well. We delivered a 96% production increase, with a 40% average uplift sustained for a year.

Their wells were originally hydraulically fractured, and subsequently had matrix acidizing done on them, but this generally had minimal success and was short-lived. The client required the additional remediation to be cost- effective and to be done efficiently together with re-perforating and acidizing.
Improve connectivity to the reservoir using electro-hydraulic stimulation technology combined with re-perforation and matrix acidization