CS 105
Central Alberta, Canada
Vertically drilled
Perforated completion
Artificial lift

96% immediate oil production uplift, with lasting effect

Matrix acidization had limited and short-lived effects on this mature well. We delivered a 96% production increase, with a 40% average uplift sustained for a year.

Matrix acidization had limited and short-lived effects on this mature well. We delivered a 96% production increase, with a 40% average uplift sustained for a year.

Combined oil production for three wells before and after workovers, CS 105.

Challenge

Their wells were originally hydraulically fractured, and subsequently had matrix acidizing done on them, but this generally had minimal success and was short-lived. The client required the additional remediation to be cost- effective and to be done efficiently together with re-perforating and acidizing.

Well Conditions

  • Depth: 2100 m (7000 ft)
  • Cardium Sandstone
  • Light oil (44 API)

Solution

Improve connectivity to the reservoir using electro-hydraulic stimulation technology combined with re-perforation and matrix acidization

  • Three wells were treated with BLUESPARK® to improve production
  • The wells were re-perforated, then stimulated with BLUESPARK® and lastly were acidized
  • An average of 8 m (26 ft) of perforated interval per well was treated with our wireline conveyed tool
  • Production rates and fluid levels were both monitored for comparison to pretreatment values

Outcome

  • The client data showed an immediate increase of 96% in the 3 wells combined.
  • Public data showed an increase from 53 to 78 BOPD in a 3-month comparison (47% increase).
  • Sustained production over one year averaged 74 BOPD, a 40% increase over the 3-month period prior to the workovers.

Talk to our experts

Let's Go

Discover our tools

Let's Go