A well with wire-wrapped sand screen and gravel pack completion failed to deliver expected production rates. We gave it a 698% boost.

A well with wire-wrapped sand screen and gravel pack completion failed to deliver expected production rates. We gave it a 698% boost.

A cased hole completion with a wire-wrapped sand screen and a gravel pack completion with an ESP pump, failed to yield expected desirable rates of water production. Known remediation techniques were reviewed and deemed unsuitable.
Improve connectivity to the reservoir through a wire-wrapped sand screen gravel pack completion, using electro-hydraulic stimulation technology.