CS 109
Western Canada
Onshore
Vertically drilled
Perforated completion
Conventional oil

Oil production up 163%, still 90% higher 1 year post-treatment

Oil production rates had decreased by over 60% in only 8 months due to carbonate scaling. We cleared it, more than doubling production.

Oil production rates had decreased by over 60% in only 8 months due to carbonate scaling. We cleared it, more than doubling production.

Average oil production before treatment and over the following year, CS 109.

Challenge

Root cause analysis, and previous data collected through solids analysis and visual characterization, concluded that a carbonate type scale was forming. Since this was a low producer, a cost-effective solution, in conjunction with a workover, was required to remediate the well. Identifying and utilizing an alternative cost-effective technology that deals directly with suspected blocking mechanism (scale) in the wellbore and near-well reservoir.

Well Conditions

  • Gething sandstone
  • Depth: 1500 m (4900 ft)
  • Temperature: 35 °C (95 °F)

Solution

Electro-hydraulic stimulation in cased hole to improve well inflow.

  • In conjunction with a workover on the well to pull tubing and bottom hole pump assembly, BLUESPARK® was deployed.
  • Completed Blue Spark BLUESPARK® Treatment over the 3 m (10 ft.) perforated zone of interest, the Gething Formation (sandstone).
  • Ran production tubing and pump assembly in wellbore and began monitoring production rates, pressure and fluid levels.
  • Immediate increase in production was observed.

Outcome

  • Oil production more than doubled after the remediation
  • Client data shows an average increase in oil production of more than 10 b/d over a 3-month period (163% increase)
  • The data for the 1-year period post-stimulation showed a 90% increase in average production to 12.6 b/d

Talk to our experts

Let's Go

Discover our tools

Let's Go