The injection rate was adequate for 10 years, then declined sharply. We boosted it by 250%, stabilising to 54% above previous 10-year average for 3 years.

The injection rate was adequate for 10 years, then declined sharply. We boosted it by 250%, stabilising to 54% above previous 10-year average for 3 years.

The original interval with an additional 20% was re-perfed with marginally better results, but within 2 years the pressure increased and rates dramatically decreased. The client wanted to try a different type of technology to obtain better, longer lasting results.
Improve connectivity to the reservoir by clearing out blockages using electro-hydraulic stimulation technology.