BLUESPARK treated two wells in less than 24 hours each. Oil and gas production increased; results were reported separately for each well.

BLUESPARK treated two wells in less than 24 hours each. Oil and gas production increased; results were reported separately for each well.

Our client had experienced a significant drop in total fluid production in these wells over the last several months. Conventional treatments, such as acid stimulation, had yielded short term results and required frequent re-treatments.
To solve near wellbore issues In the reservoir, an alternative remediation technique that was efficient and cost-effective was required.
Improve connectivity to the reservoir using electro-hydraulic stimulation technology.
Increase oil and gas production in both wells: