A scaled perforated interval in Canada’s Slave Point formation was treated during a workover. Oil production rose 716% over the first month and held 258% higher over three months.

A scaled perforated interval in Canada’s Slave Point formation was treated during a workover. Oil production rose 716% over the first month and held 258% higher over three months.
Client determined that a reduction in total oil production from a producing well was due to scaling of a perforated interval in the Slave Point production zone. Indications of calcium carbonate (CaCO3) on both tubular and bottom hole pump were determined as the cause of the decreasing production.
Client required a cost effective remedial solution, in conjunction with a work over, to increase production. Client was seeking to deploy a technology that is simple, and that deals directly with the root cause of the decline – scaling and near-wellbore formation damage.

Electro-hydraulic stimulation in cased hole applications.