Drilling rig at sunset.
CS 118
North America
CANADA
Injection Well
Vertical
Perforations
Sandstone

3 years of sustained improvements

BLUESPARK treatment achieved a 52% increase in injection average, with improvements sustained over three years.

BLUESPARK treatment achieved a 52% increase in injection average, with improvements sustained over three years.

Key results

  • Perforated Completion
  • One day total operating time
  • 52% increase in injection average
  • Substantially sustained increase, 80% in sustained injection over 3-years

Challenge

Well had initially been a producer for 8 years and then was converted to an injector. Over the next 40 years, the well was re-perforated twice due to declining injection rates. After the second re-perf, the injection rate declined gradually for 10 years.

After being shut-in for almost 2 years, the client decided to try a different type of technology to obtain better, longer lasting results.

  • Depth: 1,000m (3,300ft)
  • Sandstone
Average Injection Rate, CS 118.

Solution

Improve injectivity into the reservoir by clearing out blockages using electro-hydraulic stimulation technology.

  • Sandstone reservoir was treated with BLUESPARK® to improve injectivity.
  • No special tools or equipment were required on location to complete the remediation operation, other than third party E-Line.
  • Approximately 13 m (42 ft) of perforated interval were treated with our wireline conveyed tool in one working day.
  • Injection rates and pressures were both monitored for comparison to pretreatment values.

Outcome

  • The wellbore was reconnected to the reservoir, as pressures decreased and injection rates increased.
  • Public data for the BLUESPARK® treated well showed an average injection increase from 2,190 b/d to 3,325 b/d for 3-months post stimulation (52% increase).
  • Sustained injection over three years has averaged 4,979 b/d compared to the 10-years post re-perf value of 2,755 b/d (80% increase).

Talk to our experts

Let's Go

Discover our tools

Let's Go