Oil production increased 268% after three months following BLUESPARK treatment and acid stimulation.

Oil production increased 268% after three months following BLUESPARK treatment and acid stimulation.
The client’s well fluids had dropped by 50% during the past 2 years. Scale deposition was suspected to be in and near the perforations. No remediation had been done in 10 years. The client was planning a workover and required a remediation method that would improve lost fluid flow.
Based on adjacent wells’ production, the client was expecting increases of approx. 5 BOPD and 5 mcf/d gas. Payout was required to be less than 9 months.

Improve connectivity to the reservoir using electro-hydraulic stimulation technology.