Offshore production platform at blue hour.
CS 123
North Sea
DENMARK
Scale Removal
Offshore Platform
SSSV

Safety valve reactivated after two failed interventions

Two chemical and mechanical interventions had failed to reactivate a scaled SSSV in the Danish North Sea. BLUESPARK removed the CaCO3 in under 24 hours and the valve was reactivated.

Two chemical and mechanical interventions had failed to reactivate a scaled SSSV in the Danish North Sea. BLUESPARK removed the CaCO3 in under 24 hours and the valve was reactivated.

Key results

  • Conventional methods not working
  • Less than 24 hours total treatment time
  • SSSV reactivated successfully

Challenge

During a routine test, a major operator determined that a Sub-Surface Safety Valve (SSSV) would not successfully perform a routine inflow pressure test due to calcium carbonate scale (CaCO3).

Two separate interventions were attempted using conventional chemical and mechanical methods, but these failed to re-activate the SSSV. The operator then decided to mobilise BLUESPARK® technology, with its ability to remove scale from complex downhole completion equipment items, without risking any damage to them.

  • Offshore Platform
  • Wireline Deployment
  • Depth: (564 m) 1,850 feet
  • Temp: 42°C (108 °F)
SSSV treatment results, CS 123

Solution

Return a critical barrier to an oil producer in the Danish sector of the North Sea using electro-hydraulic pulsing technology.

  • BLUESPARK® service was mobilised at short notice and run on third party wireline.
  • Service required no chemicals, explosives or controlled goods.
  • 3m (10feet) interval across the SSSV was treated with BLUESPARK®, removing the CaCO3 scale.
  • Total operating time was less than 24 hours.
  • SSSV was success fully activated and in flow pressure tested.
  • Well was handed back to Production.

Outcome

  • Blue Spark Energy successfully performed its first Sub-Surface Safety Valve (SSSV) re-activation in the Danish North Sea using our innovative BLUESPARK® technology.
  • Demonstrated ability to selectively remove scale over sections of the tubing, verified by Caliper logs.
  • Effective for NUI (normally unmanned installations) with small footprints and challenging lifting restrictions.
  • After BlueSpark, the well returned to fully compliant integrity status, without the requirement for a workover, saving time and cost.

Talk to our experts

Let's Go

Discover our tools

Let's Go