330% increase in injection rate using BlueSpark & Acid Vs. 50% increase with acid alone

330% increase in injection rate using BlueSpark & Acid Vs. 50% increase with acid alone
The client operates 200 wells in a field, with only two water injection wells being used to maintain pressure in one portion of the field.
Both wells suffer from near-wellbore damage due to scale and suspended solids. To treat the problem, acid stims were conducted every 6 to 8 months, but with diminishing rate of returns. The client was looking to reduce workover frequency and to increase injection rates.

Improve connectivity to the reservoir by removing blockages using electro-hydraulic stimulation technology.