Drilling rig and loader beneath a patterned cloud sky.
CS 128
North America
CANADA
Chemical Treatment
Injection Well
Vertical
Perforations
Sandstone

Disposal well stimulation five times more effective

BLUESPARK treatment preceded customer chemical treatment and achieved results five times the historical stimulation average.

BLUESPARK treatment preceded customer chemical treatment and achieved results five times the historical stimulation average.

Key results

  • Run on E-Line
  • 8 hours total treatment time
  • BlueSpark 212 tool
  • 5x more effective than the historical stimulation average
CS128 cumulative injection volumes and treatment comparison table, including 30-day and 90-day injection rates and pressures.

Challenge

A 5 year old disposal well was experiencing reduced injection rates and increased injection pressure. Over a 2 year period, 20 stimulations were conducted, averaging one treatment every 33 days.

The client was looking for a cost effective treatment that would:

improve the injection rate

decrease the injection pressure

reduce stimulation frequency

  • McMurray Sandstone
  • Depth 500 m (1600 ft)

Solution

  • The BLUESPARK® tool was deployed through tubing on third-party E-Line and completed in 8 hours.
  • Post BLUESPARK® customer chemical treatment conducted.
  • 5X more effective than historical stimulation average.

Outcome

Following BLUESPARK treatment and subsequent customer chemical treatment, the recorded treatment longevity exceeded 170 days. Previous stimulations had averaged one treatment every 33 days. The 30-day average injection rate was 421 m³/day at 2,868 kPa. At 90 days, the averages were 339 m³/day and 3,063 kPa.

Talk to our experts

Let's Go

Discover our tools

Let's Go