CS 130
North America
CANADA
Injection Well
Horizontal
Hydraulically Fractured Completion
Shale

12-month average injection rate increased 6600%

Removing CaSO4 scale and clearing out blockages cleared the path for subsequent ‘green’ acid treatment.

Removing CaSO4 scale and clearing out blockages cleared the path for subsequent 'green' acid treatment.

Water injection rates following acid and BLUESPARK treatments, CS 130.

Water injection rates following acid and BLUESPARK treatments, CS 130.

Challenge

The well initially injected at over 300 b/d. The injection rate had fallen to below 100 b/d within 2 years. After falling to 20 b/d a year later, an acid job returned the injection rate to 100 b/d, but that lasted only 3 months. The client was looking for a cost-effective solution that would last longer.

Well Conditions

  • Measured Depth: 3,000 m (10,000 ft)
  • TVD: 1,500 m (5,000 ft)
  • Bakken shale

Solution

Improve connectivity to the reservoir by removing CaSO4 scale and clearing out blockages using electro-hydraulic stimulation technology

  • The BLUESPARK® 275 tool was run on tractor to the bottom of the lateral and then was pulsed at each frac port while moving uphole
  • The well was treated in 13 hours of total operating time
  • “Green” acid was bull-headed down the wellbore to the interval that had just been treated
  • The well was put back on injection and monitored

Outcome

  • The well saw an immediate increase in injectivity
  • The average 3-month injection rate went from 2.2 b/d to 73.9 b/d (3200% increase)
  • The average injection rate for the 12-months post-BLUESPARK® was 148.3 b/d (6600% increase)