Drilling rig beside a lined pit on flat arid ground at sunset.
CS 132
North America
USA
TEXAS
Scale Removal
Vertical
Tubulars

9 barium sulfate wells treated

Nine barium sulfate wells were treated with BLUESPARK, with a 45% increase in aggregate oil rate.

Nine barium sulfate wells were treated with BLUESPARK, with a 45% increase in aggregate oil rate.

Key results

  • Perforated Completion
  • 45% increase to the aggregate oil rate
  • 0.5% decrease in water cut
  • 72% increase gas production increase

Challenge

A major client in West Texas has a field in which most wells develop barium sulfate scale (BaSO4). The BaSO4 scale can build very rapidly, resulting in reduced production. The scale builds up in the tubing/casing and in the perforation tunnels.

The client wanted to try a method to remove the scale in the casing as well as in the perforation tunnels in one trip into the well.

  • Depth: 4,800 – 5,200 ft (1,460 – 1,585 m)
  • Sandstone formation
Aggregate Rates for 9 Wells, CS 132.

Solution

Improve connectivity to the reservoir by removing BaSO4 scale and clearing out blockages using electro-hydraulic stimulation technology.

  • An initial well was chosen to test the new technology.
  • The BLUESPARK® tool was run over the perforated interval on third-party E-Line.
  • A sample of the fill created confirmed BaSO4 as well as silica and clay from the formation.
  • Eight more wells we added to the program, which were all treated without any operational issues.
  • All wells were put back on production and monitored.

Outcome

  • The 9 wells saw the aggregate oil rate increase from 739 b/d to 1071 b/d (45%).
  • Water cut decreased by 0.5%.
  • Gas increased from 13642 mcf/d to 23421 mcf/d (72%).

Talk to our experts

Let's Go

Discover our tools

Let's Go