CS 136
NE Alberta, Canada
CSS oil field
Horizontally drilled well

Faster back to production; rate +90%

CaCO3 scale was removed with BlueSpark on one well, with post-treatment performance compared against local peers.

CaCO3 scale was removed with BlueSpark on one well, with post-treatment performance compared against local peers.

Gross fluid production for the treated well and peer wells after steamflood conversion, CS 136.

Gross fluid production for the treated well and peer wells after steamflood conversion, CS 136.

Challenge

The client chose Well #4 on a particular pad for treatment with symptoms that included a DP of over 1 MPa, 40% plugging on the steam-throttle-joint (STJ) curve and poor gross production vs DI performance compared to the average. BLUESPARK® was chosen for the treatment as there would be no damage to any completion equipment, maintaining well integrity.

Well Conditions

  • Measured depth: 2000 m (6600 ft)
  • Clearwater shale

Solution

Improve connectivity to the reservoir by removing CaCO3 scale and clearing out blockages using electro-hydraulic stimulation technology

  • Well #4 was cooled by pumping warm water down the liner to cool the wellbore to below 130 °C
  • BLUESPARK® 275 tool was conveyed on third-party e-Coil to the toe of the wellbore
  • There were 21 distinct intervals of 1.0 m treated as the toolstring was pulled up the wellbore towards the heel
  • The field was then switched from CSS to steamflood, and Well #4 was monitored, along with 4 other wells on the same pad that were not treated with BLUESPARK®

Outcome

  • Well #4 (BLUESPARK® treated well) achieved a quicker and higher ramp up in production (graphs on reverse side)
  • After factoring in flush production and incremental fluid production due to reservoir pressure communication, the client calculated there was an additional 60 m3/d of sustained gross fluid production for Well #4 vs the other wells on the same pad
  • Well #4 had a 90% higher rate in the first 3 months vs the other wells ^^, and a 79% higher rate in the 90-120 day post interwell communication established period

^^ Average, not including well #5