Equipment on the topsides of an offshore platform.
CS 147
North Sea
UK NORTH SEA
Scale Removal
Offshore Platform
Tubulars

1.5-inch scale cleared from a Christmas tree

Scale up to 1.5 inches thick blocked access through a UK North Sea Christmas tree. Downward pulsing cleared it with no risk to the wellhead, saving five days over pumping chemicals.

Scale up to 1.5 inches thick blocked access through a UK North Sea Christmas tree. Downward pulsing cleared it with no risk to the wellhead, saving five days over pumping chemicals.

Key results

  • 1.5 inch thick scale removed
  • Faster Treatment 5 days saved vs pumping chemicals
  • Safe Treatment No risk of damage or tools being stuck
  • Downwards Pulsing Radial pulses worked below the BlueSpark tool to gain access
scale treatment results, CS 147

Challenge

A major operator in the UK North Sea could not gain access to the wellbore of a producing well due to scale build up in the wellhead “Christmas Tree” (XT), confirmed visually by camera. They were looking for a treatment method that could effectively remove the scale without damaging any components of the wellhead.

  • Depth: 35 m (120 ft)
  • Temperature: 10 °C (50 °F)
  • Treated Sea Water/TEG in wellbore
  • Calcium Carbonate (CaCO3) scale

Solution

Remove scale by pulsing downward using electro-hydraulic pulsing technology

  • The BLUESPARK® 275 tool was run in on 3rd party wireline
  • Heavy scale (~1.5” thick) was encountered in various sections of the XT
  • Several runs were made to clear scale from the swab valve down past the Lower Master Valve (LMV)
  • A camera was run post-treatment to confirm the scale removal and the condition of the XT

Outcome

  • Up to 1.5” thick scale was removed over the treated intervals, as confirmed by camera images
  • Scale was removed, and the customer now had access through the XT into the main wellbore.