Preliminary results indicate a 20% increase in gas production after a 220 ft interval in a deviated Malaysian well was treated in 20 hours.

Preliminary results indicate a 20% increase in gas production after a 220 ft interval in a deviated Malaysian well was treated in 20 hours.
A major operator in Malaysia was encountering skin damage in their wells due to perforations plugged with CaCO3 scale. The customer was looking for a cost-effective alternative to remove the scale and improve production.

Improve connectivity to the reservoir clearing out blockages using electro-hydraulic pulsing technology