CS 154
Middle East
Conventional oil field
Sandstone reservoir

Disposal well injection increased 175%

A major operator in the Middle East was encountering near wellbore formation damage due to fines and sludge in a salt-water disposal well.

A major operator in the Middle East was encountering near wellbore formation damage due to fines and sludge in a salt-water disposal well.

Challenge

The customer was looking for a cost-effective alternative to remove the blockages and return the well to a pre-damaged state. Due to previous success with the treatment of producing wells, the operator choose BLUESPARK® to treat this well.

Well Conditions

  • Open Hole completion
  • Depth: 7200 ft (2200 m)
  • Temperature: 190 °F (88 °C)

Treatment results for the disposal well in case study CS 154.

Solution

Improve connectivity to the reservoir clearing out blockages using electro-hydraulic pulsing technology

  • The BLUESPARK® 275 tool was run on third-party E-Line to the treatment interval of the well
  • A 100-foot (30 m) open-hole interval was treated in a treatment time of 13 hours with 100% operational efficiency
  • The intervention was completed in almost 50% less total time than a traditional intervention for the same problem
  • The well was put back on injection and monitored

Outcome

  • The water injection rate increased by 175%
  • The gas-oil separation facility saw a corresponding drop in the disposal network pressure, enabling two oil producing wells to start to flow, adding a 4% increase to the total oil output
  • Along with a 50% reduction in intervention time, there was a 53% decrease in CO2 emissions