Offshore Platform

9 out of 10 SSSVs restored in a single campaign
Ten failed safety valves is a production problem. Nine of ten were restored and passed inflow testing...
Learn More
SSSV functionality restored
11 hours of treatment reactivated SSSV that failed inflow test twice in 12 months.
Learn More
A deep clean to enable pre-P&A plug setting
Brushes failed on the same section. We succeeded. Same wellbore, same scale, different result.
Learn More
90% of original capacity restored
44 holes of 12mm across 27 metres of ICD screen. We treated the restriction points: +53% production,...
Learn More
Production increase sustained for 15 months +
The GR log showed scale was removed from both the inside and outside of the screens - in a section no...
Learn More
3 days that worked v 2 weeks that didn’t
H₂S sour, over 50% CO₂, 107°C, filled with 1.6 g/cc mud. The coiled tubing job failed. We treated it:...
Learn More
Gas lift valves retrieved
The inclination was too high for a conventional brush. We ran the tool - and the gas lift valves came...
Learn More