North Sea

Bridge-linked offshore platform at dusk.
SSSV cleaned, insert valve avoided
BLUESPARK removed scale from an SSSV across a 13 ft interval in six hours. The valve passed an inflow...
Learn More
Equipment on the topsides of an offshore platform.
Scale removed from wellhead
BLUESPARK removed 1.5 inch thick scale from a wellhead. Read the operating challenge, treatment details...
Learn More
Helicopter beside offshore drilling rigs.
Fast deployment offshore
BLUESPARK mobilized in 24 hours and treated a 25 ft interval offshore. Scale removal enabled a successful...
Learn More
Offshore drilling rig near a wooded coastline.
Targeted treatment of the ASV
BLUESPARK treated a 25 m interval across an annular safety valve. Caliper logs confirmed 80-100% scale...
Learn More
Offshore vessel at sea.
SSSV reactivated from LWI vessel
SSSV reactivation from an LWI vessel regained 324 bopd aggregate oil production for the first 30 days....
Learn More
Offshore crew in coveralls working on deck.
SSSV reactivated after years of shut in
An SSSV was reactivated after years of shut-in, and production resumed after eight years. Read the BLUESPARK...
Learn More
Jack-up drilling rig.
Complete scale removal
Complete scale removal with BLUESPARK saved eight days compared with the planned coil operation. Read...
Learn More
Distant offshore platform under heavy cloud.
BaSO4 scale removed from SCSSV
BLUESPARK removed BaSO4 scale from an SCSSV and maintained 3,500 bopd production. Read the treatment...
Learn More
Offshore platform at dusk.
BaSO4 scale removed from GLV/SPM
BLUESPARK removed BaSO4 scale from a GLV/SPM across a 20 ft interval, including tubing above and below...
Learn More
Offshore production platform at blue hour.
SSSV reactivated
An SSSV was reactivated successfully using BLUESPARK treatment. Read the challenge, treatment procedure...
Learn More
Barium sulfate scale removed from sand screen sections
Tough barium sulfate scale could have meant the end for this well on the NCS. BlueSpark cleared it, extending...
Learn More
SSSV functionality restored
11 hours of treatment reactivated SSSV that failed inflow test twice in 12 months.
Learn More