Asia Pacific

Crew member on a steel walkway.
Geothermal injection well treated
BLUESPARK treated a geothermal injection well in Japan in 13 hours. Injection rate increased 12x; five...
Learn More
Offshore platform in tropical water.
Injection restored
BLUESPARK restored injection, with a stated 90% water production return. Read the well challenge, treatment...
Learn More
Scale removal in a deviated well
Preliminary results indicate a 20% increase in gas production after a 220 ft interval in a deviated Malaysian...
Learn More
3 days that worked v 2 weeks that didn’t
H₂S sour, over 50% CO₂, 107°C, filled with 1.6 g/cc mud. The coiled tubing job failed. We treated it:...
Learn More