Producing Well

9 out of 10 SSSVs restored in a single campaign
Ten failed safety valves is a production problem. Nine of ten were restored and passed inflow testing...
Learn More
SSSV functionality restored
11 hours of treatment reactivated SSSV that failed inflow test twice in 12 months.
Learn More
A deep clean to enable pre-P&A plug setting
Brushes failed on the same section. We succeeded. Same wellbore, same scale, different result.
Learn More
90% of original capacity restored
44 holes of 12mm across 27 metres of ICD screen. We treated the restriction points: +53% production,...
Learn More
Production increase sustained for 15 months +
The GR log showed scale was removed from both the inside and outside of the screens - in a section no...
Learn More
3 days that worked v 2 weeks that didn’t
H₂S sour, over 50% CO₂, 107°C, filled with 1.6 g/cc mud. The coiled tubing job failed. We treated it:...
Learn More
A healed well, production up 970%
Four Oman wells with plugged gravel packs - aggregate production went from 30 to 324 barrels a day at...
Learn More
60% production uplift in 20% of the treatment time
60% production uplift, achieved in a day, instead of 5.
Learn More
A break-through after endless retreatments
Treated 10% of screen section. The result: from 300 bopd to 900 from a severely restricted well.
Learn More
A 9x increase in oil production
14 perforation clusters, cleared in 8 hours, no special kit required on site. Oil production up 850%...
Learn More