P & A

Helicopter beside offshore drilling rigs.
Fast deployment offshore
BLUESPARK mobilized in 24 hours and treated a 25 ft interval offshore. Scale removal enabled a successful...
Learn More
Offshore drilling rig near a wooded coastline.
Targeted treatment of the ASV
BLUESPARK treated a 25 m interval across an annular safety valve. Caliper logs confirmed 80-100% scale...
Learn More
Jack-up drilling rig.
Complete scale removal
Complete scale removal with BLUESPARK saved eight days compared with the planned coil operation. Read...
Learn More
A deep clean to enable pre-P&A plug setting
Brushes failed on the same section. We succeeded. Same wellbore, same scale, different result.
Learn More