Skip to Content
Home
Technology
Applications
Production Enhancement
Equipment Cleaning
Scale Sampling
Intentional cement removal
Track Record
News & Events
About
Careers
Contact
Producing Well
North America
One year post treatment, production still up 100%+
Conventional stimulation techniques were not economical or had proven ineffective. We delivered a sustained...
Learn More
Middle East
9 out of 10 SSSVs restored in a single campaign
Ten failed safety valves is a production problem. Nine of ten were restored and passed inflow testing...
Learn More
North Sea
SSSV functionality restored
11 hours of treatment reactivated SSSV that failed inflow test twice in 12 months.
Learn More
North Sea
A deep clean to enable pre-P&A plug setting
Brushes failed on the same section. We succeeded. Same wellbore, same scale, different result.
Learn More
North Sea
90% of original capacity restored
44 holes of 12mm across 27 metres of ICD screen. We treated the restriction points: +53% production,...
Learn More
North Sea
Production increase sustained for 15 months +
The GR log showed scale was removed from both the inside and outside of the screens - in a section no...
Learn More
Asia Pacific
3 days that worked v 2 weeks that didn’t
H₂S sour, over 50% CO₂, 107°C, filled with 1.6 g/cc mud. The coiled tubing job failed. We treated it:...
Learn More
Middle East
A healed well, production up 970%
Four Oman wells with plugged gravel packs - aggregate production went from 30 to 324 barrels a day at...
Learn More
Middle East
60% production uplift in 20% of the treatment time
60% production uplift, achieved in a day, instead of 5.
Learn More
North America
A break-through after endless retreatments
BLUESPARK treated two wells in less than 24 hours each. Oil and gas production increased; results were...
Learn More
North America
A 9x increase in oil production
14 perforation clusters, cleared in 8 hours, no special kit required on site. Oil production up 850%...
Learn More
1
2