APAC-PW-148 (Malaysia)
CHALLENGE
A major operator in Malaysia was encountering skin damage in their wells due to perforations plugged with CaCO3 scale. The customer was looking for a cost-effective alternative to remove the scale and improve production.
SOLUTION
Improve connectivity to the reservoir clearing out blockages using electro-hydraulic pulsing technology
• The BLUESPARK® 275 tool was run on third-party E-Line to the treatment interval
• An interval of 220 ft (67 m) was treated in 20 hrs of total operating time
• A camera was run to determine the extent of any scale remaining
• The well was put back on production and monitored
CONDITIONS
Depth: 5,000ft (1,500 m)
Temperature: 195 °F (90 °C)
~50 deg deviation
OUTCOME
Comparison of camera images from before and after treatment show removal of a majority of the scale present, as seen in the images above
Preliminary results indicate an increase of gas production of 2.4 MMscf/d
Blue Spark Energy is paving the way towards a sustainable, dynamic oil & gas industry. As leaders in high-pulse powered wellbore remediations, we provide a revolutionary technology that is a safe, cost-effective, and efficient solution for forward-thinking energy providers.