SSSV

Bridge-linked offshore platform at dusk.
SSSV cleaned, insert valve avoided
BLUESPARK removed scale from an SSSV across a 13 ft interval in six hours. The valve passed an inflow...
Learn More
Offshore drilling rig near a wooded coastline.
Targeted treatment of the ASV
BLUESPARK treated a 25 m interval across an annular safety valve. Caliper logs confirmed 80-100% scale...
Learn More
Offshore vessel at sea.
SSSV reactivated from LWI vessel
SSSV reactivation from an LWI vessel regained 324 bopd aggregate oil production for the first 30 days....
Learn More
Drilling rig beyond a wetland and trees.
Access gained to retrieve WRSSSV
BLUESPARK gained access to retrieve a WRSSSV, with visual confirmation of scale removal. Read the treatment...
Learn More
Offshore crew in coveralls working on deck.
SSSV reactivated after years of shut in
An SSSV was reactivated after years of shut-in, and production resumed after eight years. Read the BLUESPARK...
Learn More
Distant offshore platform under heavy cloud.
BaSO4 scale removed from SCSSV
BLUESPARK removed BaSO4 scale from an SCSSV and maintained 3,500 bopd production. Read the treatment...
Learn More
Offshore production platform at blue hour.
SSSV reactivated
An SSSV was reactivated successfully using BLUESPARK treatment. Read the challenge, treatment procedure...
Learn More
9 out of 10 SSSVs restored in a single campaign
Ten failed safety valves is a production problem. Nine of ten were restored and passed inflow testing...
Learn More
SSSV functionality restored
11 hours of treatment reactivated SSSV that failed inflow test twice in 12 months.
Learn More