Tubulars

Equipment on the topsides of an offshore platform.
Scale removed from wellhead
BLUESPARK removed 1.5 inch thick scale from a wellhead. Read the operating challenge, treatment details...
Learn More
Helicopter beside offshore drilling rigs.
Fast deployment offshore
BLUESPARK mobilized in 24 hours and treated a 25 ft interval offshore. Scale removal enabled a successful...
Learn More
Drilling rig beside a lined pit on flat arid ground at sunset.
9 barium sulfate wells treated
Nine barium sulfate wells were treated with BLUESPARK, with a 45% increase in aggregate oil rate. Read...
Learn More
Jack-up drilling rig.
Complete scale removal
Complete scale removal with BLUESPARK saved eight days compared with the planned coil operation. Read...
Learn More
A deep clean to enable pre-P&A plug setting
Brushes failed on the same section. We succeeded. Same wellbore, same scale, different result.
Learn More