Case Studies
NSEA-SR-147 (North Sea)
Removed scale from the wellhead using BLUESPARK®, allowing access into the main wellbore.
NSEA-SR-146 (North Sea)
Removed scale from the upper completion of the wellbore using the BLUESPARK®, treating a 7.5 m (25 ft) interval with an operating time of 6.25 hours.
NAM-SR-132 (USA Permian)
The 9 wells saw the aggregate oil rate increase from 739 b/d to 1071 b/d (45%). Water cut decreased by 0.5%. Gas increased from 13642 mcf/d to 23421 mcf/d (72%).
NSEA-SR-131 (North Sea)
BLUESPARK® completely removed 40 ft of calcium carbonate (CaCO3) scale from the inside of tubing in less than 2 days, as confirmed by the caliper log.