Vertical

Crew members wearing hard hats beside a pipeline.
Geothermal well brought back online
BLUESPARK treated a 105 ft interval in a geothermal well in eight hours. Well production increased 134%....
Learn More
Drilling rig and tanks on dry ground at sunset.
Sustained production
BLUESPARK treatment achieved a 70% increase in total oil rate. Read the challenge, treatment details...
Learn More
Drilling rig at dusk.
Disposal wells treated
Disposal well treatment achieved a sustained 23% injectivity increase for well #1 over six months. Read...
Learn More
Drilling rig beside a lined pit on flat arid ground at sunset.
9 barium sulfate wells treated
Nine barium sulfate wells were treated with BLUESPARK, with a 45% increase in aggregate oil rate. Read...
Learn More
Drilling rig and loader beneath a patterned cloud sky.
Acid effectiveness boosted
BLUESPARK treatment preceded customer chemical treatment and achieved results five times the historical...
Learn More
Drilling rig in a red-rock landscape.
Sustained results, outperforming acid
Gas production increased 300% over a three-month comparison following BLUESPARK treatment. Read the comparison...
Learn More
Drilling rig lit at night among trees.
Effect of acid amplified & extended
Injection rate increased 330% using BLUESPARK and acid, compared with 50% using acid alone. Read the...
Learn More
Drilling rig site on flat desert ground.
Boosting “green” acid
BLUESPARK treatment combined with green acid achieved an 1180% oil production increase three months after...
Learn More
Drilling rig at the end of a gravel road across flat scrubland.
Injection average increased
Injection average increased 1900% after a 21 ft interval was treated in under five hours without a workover....
Learn More
Drilling rig on red desert ground.
Acid boosted for 10x production
Oil production increased 268% after three months following BLUESPARK treatment and acid stimulation....
Learn More
Drilling rig at sunset.
3 years of sustained improvements
BLUESPARK treatment achieved a 52% increase in injection average, with improvements sustained over three...
Learn More
Drilling rig beneath a stormy sky.
Immediate oil production increase
Average oil production increased 716% over one month following BLUESPARK treatment. Read the treatment...
Learn More