Case Studies
NAM-SR-109 (Canada West)
Oil production more than doubled after the remediation. Client data shows an average increase in oil production of more than 10 STB/ day over a 3- month period (163% increase).
NAM-PW-108 (Canada West)
The well immediately produced oil at a higher rate that before being shut-in, but water production was less. The oil production increased from 16.3 bbl/d to 26.9 b/d, comparing 3-month pre- to post-BLUESPARK®.
NAM-CT-105 (Canada West)
The client data showed an immediate increase of 96% in the 3 wells combined. Public data showed an increase from 53 to 78 BOPD in a 3-month comparison (47% increase).
CE-CT-104 (Romania)
BLUESPARK® stimulation resulted in a doubling of production, from 3.5 to 7.3 BOPD, sustained for a month prior to the customer deciding to acidize.
NAM-PW-103 (Canada West)
Worm-holes were re-initiated allowing oil to flow into the well. Client data from the BLUESPARK® treated well showed an average production increase from 0 bbl/day to 5.9 bbl/day for 90 days post stimulation.
NAM-CT-102 (Canada West)
Client data from the BLUESPARK® treated well showed an increase from 2.2 bbl/day (0.35m3/d) of oil to 5.9bbl/day (0.93 m3/d) in the first 45 days post stimulation.
NAM-PW-101 (Canada West)
Client data from the BLUESPARK® treated well showed an average production increase from 9.4 bbl/day to 18.9 bbl/day over a one-month period, based on previous test results, a dramatic 100% increase in just oil production.