Case Studies
The energy industry is becoming more innovative by the day — from how wells are drilled, to how those wells are produced, to how that product is refined and sent to market.
Our BLUESPARK® technology has far-reaching applications throughout the lifecycle of a well across the energy sector, including Hydrocarbon and Geothermal. Learn how Blue Spark Energy and our clients are part of the energy evolution.
Search by Region
Africa | Asia Pacific | Canada East | Canada West | Continental Europe | Middle East | North Sea | USA California | USA Mid-Continent | USA Permian
Search by Application
Chemical Treatment | Injection Well | New Well | Open Hole | Producing Well | Scale Removal | P&A
Search by Well Type
Vertical | Deviated | Horizontal | Offshore Platform | Geothermal
NAM-SR-136 (Canada West)
Well #4 (BLUESPARK® treated well) achieved a quicker and higher ramp up in production. After factoring in flush production and incremental fluid production due to reservoir pressure communication, the client calculated there was an additional 60 m3/d of sustained gross fluid production for Well #4 vs the other wells on the same pad.
NAM-IW-133 (Canada West)
Both wells saw an immediate drop in injection pressure resulting in an increase in injection rate. Step rate tests done immediately after the treatment and after several months confirmed lower pressures and higher injection rates than before the treatment were being maintained.
NAM-IW-130 (Canada West)
The well saw an immediate increase in injectivity. The average 3-month injection rate went from 2.2 b/d to 73.9 b/d (3200% increase).
NAM-IW-128 (Canada West)
The BLUESPARK® tool was deployed through tubing on third-party E-Line and completed in 8 hours.
NAM-IW-125 (Canada West)
The well saw an immediate increase in injection rates and a decrease in injection pressure. The average injection rate increased from a 3-month average of 97 b/d to 419 b/d for the first 3 months after BLUESPARK® + Acid.
NAM-IW-122 (Canada West)
Client data from the BLUESPARK® treated well showed over 20x increase in injection rate and 45% reduction in injection pressure. 6 months later this well injects between 60 to 90 bbl/d and pressure is at 4200 kPa.
NAM-IW-118 (Canada West)
BLUESPARK® treated well showed a 52% injection increase 3 months post-stimulation, and 80% injection increase over the longterm.
NAM-SR-117 (Canada West)
Significant inflow of oil was produced after the remediation. Client data shows an average oil production of 36.7 b/d over a one-month period (716% increase).
NAM-IW-111 (Canada West)
The wellbore was reconnected to the reservoir, as pressures decreased and injection rates increased. Public data from the BLUESPARK® treated well showed an average injection increase from 83 b/d to 289 b/d for 3-months post stimulation.
NAM-SR-109 (Canada West)
Oil production more than doubled after the remediation. Client data shows an average increase in oil production of more than 10 STB/ day over a 3- month period (163% increase).
NAM-PW-108 (Canada West)
The well immediately produced oil at a higher rate that before being shut-in, but water production was less. The oil production increased from 16.3 bbl/d to 26.9 b/d, comparing 3-month pre- to post-BLUESPARK®.
NAM-NW-106 (Canada West)
Client data from the BLUESPARK® treated well showed an average production increase from 100m3/day (630 bbl/day) to 800m3/day (5,032 bbl/day) over a one-month period.
NAM-CT-105 (Canada West)
The client data showed an immediate increase of 96% in the 3 wells combined. Public data showed an increase from 53 to 78 BOPD in a 3-month comparison (47% increase).
NAM-PW-103 (Canada West)
Worm-holes were re-initiated allowing oil to flow into the well. Client data from the BLUESPARK® treated well showed an average production increase from 0 bbl/day to 5.9 bbl/day for 90 days post stimulation.
NAM-CT-102 (Canada West)
Client data from the BLUESPARK® treated well showed an increase from 2.2 bbl/day (0.35m3/d) of oil to 5.9bbl/day (0.93 m3/d) in the first 45 days post stimulation.
NAM-PW-101 (Canada West)
Client data from the BLUESPARK® treated well showed an average production increase from 9.4 bbl/day to 18.9 bbl/day over a one-month period, based on previous test results, a dramatic 100% increase in just oil production.