Case Studies
NAM-SR-136 (Canada West)
Well #4 (BLUESPARK® treated well) achieved a quicker and higher ramp up in production. After factoring in flush production and incremental fluid production due to reservoir pressure communication, the client calculated there was an additional 60 m3/d of sustained gross fluid production for Well #4 vs the other wells on the same pad.
NAM-IW-130 (Canada West)
The well saw an immediate increase in injectivity. The average 3-month injection rate went from 2.2 b/d to 73.9 b/d (3200% increase).
NAM-IW-125 (Canada West)
The well saw an immediate increase in injection rates and a decrease in injection pressure. The average injection rate increased from a 3-month average of 97 b/d to 419 b/d for the first 3 months after BLUESPARK® + Acid.
NAM-CT-102 (Canada West)
Client data from the BLUESPARK® treated well showed an increase from 2.2 bbl/day (0.35m3/d) of oil to 5.9bbl/day (0.93 m3/d) in the first 45 days post stimulation.