Case Studies

NAM-SR-136 (Canada West)

Well #4 (BLUESPARK® treated well) achieved a quicker and higher ramp up in production. After factoring in flush production and incremental fluid production due to reservoir pressure communication, the client calculated there was an additional 60 m3/d of sustained gross fluid production for Well #4 vs the other wells on the same pad.

Read More

NAM-IW-122 (Canada West)

Client data from the BLUESPARK® treated well showed over 20x increase in injection rate and 45% reduction in injection pressure. 6 months later this well injects between 60 to 90 bbl/d and pressure is at 4200 kPa.

Read More

NAM-SR-119 (USA Permian)

The client ran back in the wellbore with tubing and discovered that the BLUESPARK® had created 11 feet of fill (in 7 inch casing). An analysis of the fill determined the presence of silica and clay, along with the BaSO4, confirming that the perf tunnels had been cleaned.

Read More