Case Studies
The energy industry is becoming more innovative by the day — from how wells are drilled, to how those wells are produced, to how that product is refined and sent to market.
Our BLUESPARK® technology has far-reaching applications throughout the lifecycle of a well across the energy sector, including Hydrocarbon and Geothermal. Learn how Blue Spark Energy and our clients are part of the energy evolution.
Search by Region
Africa | Asia Pacific | Canada East | Canada West | Continental Europe | Middle East | North Sea | USA California | USA Mid-Continent | USA Permian
Search by Application
Chemical Treatment | Injection Well | New Well | Open Hole | Producing Well | Scale Removal | P&A
Search by Well Type
Vertical | Deviated | Horizontal | Offshore Platform | Geothermal
MENA-IW-154 (Middle East)
The salt-water injection well was cleaned of formation damage due to fines and sludge, resulting in an increase in the injection rate of 175% while reducing CO2 emissions. The oil production of the field also increased.
APAC-IW-149 (Japan)
The injection rate increased to as much as 12x the rate before treatment
APAC-IW-144 (Asia Pacific)
Improved connectivity to the reservoir. Injection zone takes water for the first time in years, a 350% increase in aquifer water production rate.
SSA-IW-141 (West Africa)
Instantaneous reduction in injection pressure by 55%, and an injection rate increase by 1,260% after BlueSpark® treatment.
NAM-IW-133 (Canada West)
Both wells saw an immediate drop in injection pressure resulting in an increase in injection rate. Step rate tests done immediately after the treatment and after several months confirmed lower pressures and higher injection rates than before the treatment were being maintained.
NAM-IW-130 (Canada West)
The well saw an immediate increase in injectivity. The average 3-month injection rate went from 2.2 b/d to 73.9 b/d (3200% increase).
NAM-IW-128 (Canada West)
The BLUESPARK® tool was deployed through tubing on third-party E-Line and completed in 8 hours.
NAM-IW-125 (Canada West)
The well saw an immediate increase in injection rates and a decrease in injection pressure. The average injection rate increased from a 3-month average of 97 b/d to 419 b/d for the first 3 months after BLUESPARK® + Acid.
NAM-IW-122 (Canada West)
Client data from the BLUESPARK® treated well showed over 20x increase in injection rate and 45% reduction in injection pressure. 6 months later this well injects between 60 to 90 bbl/d and pressure is at 4200 kPa.
NAM-IW-118 (Canada West)
BLUESPARK® treated well showed a 52% injection increase 3 months post-stimulation, and 80% injection increase over the longterm.
NAM-IW-111 (Canada West)
The wellbore was reconnected to the reservoir, as pressures decreased and injection rates increased. Public data from the BLUESPARK® treated well showed an average injection increase from 83 b/d to 289 b/d for 3-months post stimulation.