NAM-SR-119 (USA Permian)
The client ran back in the wellbore with tubing and discovered that the BLUESPARK® had created 11 feet of fill (in 7 inch casing). An analysis of the fill determined the presence of silica and clay, along with the BaSO4, confirming that the perf tunnels had been cleaned.
NAM-SR-117 (Canada West)
Significant inflow of oil was produced after the remediation. Client data shows an average oil production of 36.7 b/d over a one-month period (716% increase).
NAM-SR-115 (USA Permian)
The post-BLUESPARK® multi-finger caliper confirmed that 100% of scale was removed at a pulsing rate of 60 pulses/ft. Oil production increased from 4.8 b/d to 8.5 b/d when comparing the 3-month pre-BLUESPARK® to 3-month post-BLUESPARK® rates.
NAM-SR-109 (Canada West)
Oil production more than doubled after the remediation. Client data shows an average increase in oil production of more than 10 STB/ day over a 3- month period (163% increase).