Case Studies
The energy industry is becoming more innovative by the day — from how wells are drilled, to how those wells are produced, to how that product is refined and sent to market.
Our BLUESPARK® technology has far-reaching applications throughout the lifecycle of a well across the energy sector, including Hydrocarbon and Geothermal. Learn how Blue Spark Energy and our clients are part of the energy evolution.
Search by Region
Africa | Asia Pacific | Canada East | Canada West | Continental Europe | Middle East | North Sea | USA California | USA Mid-Continent | USA Permian
Search by Application
Chemical Treatment | Injection Well | New Well | Open Hole | Producing Well | Scale Removal | P&A
Search by Well Type
Vertical | Deviated | Horizontal | Offshore Platform | Geothermal
NSEA-SR-146 (North Sea)
Removed scale from the upper completion of the wellbore using the BLUESPARK®, treating a 7.5 m (25 ft) interval with an operating time of 6.25 hours.
NSEA-SR-145 (North Sea)
BLUESPARK® reduced scale by 80 – 100% and saved up to 5 days of operating time and USD $200K. The treatment was completed in one run in less than 14 hours of operating time.
NSEA-SR-131 (North Sea)
BLUESPARK® completely removed 40 ft of calcium carbonate (CaCO3) scale from the inside of tubing in less than 2 days, as confirmed by the caliper log.