Scale Removal

Drilling rig site on flat desert ground.
Boosting “green” acid
BLUESPARK treatment combined with green acid achieved an 1180% oil production increase three months after...
Learn More
Offshore production platform at blue hour.
SSSV reactivated
An SSSV was reactivated successfully using BLUESPARK treatment. Read the challenge, treatment procedure...
Learn More
Drilling rig on red desert ground.
Acid boosted for 10x production
Oil production increased 268% after three months following BLUESPARK treatment and acid stimulation....
Learn More
Drilling rig beneath a stormy sky.
Immediate oil production increase
Average oil production increased 716% over one month following BLUESPARK treatment. Read the treatment...
Learn More
Scale removal in a deviated well
Preliminary results indicate a 20% increase in gas production after a 220 ft interval in a deviated Malaysian...
Learn More
Faster back to production; rate +90%
CaCO3 scale was removed with BlueSpark on one well, with post-treatment performance compared against...
Learn More
Barium sulfate scale removed from sand screen sections
Tough barium sulfate scale could have meant the end for this well on the NCS. BlueSpark cleared it, extending...
Learn More
Recurring scale removed, oil production up 77%
Calcium carbonate scale kept slowing production, BlueSpark cleared it all - from perforations and from...
Learn More
9 out of 10 SSSVs restored in a single campaign
Ten failed safety valves is a production problem. Nine of ten were restored and passed inflow testing...
Learn More
SSSV functionality restored
11 hours of treatment reactivated SSSV that failed inflow test twice in 12 months.
Learn More
A deep clean to enable pre-P&A plug setting
Brushes failed on the same section. We succeeded. Same wellbore, same scale, different result.
Learn More
90% of original capacity restored
44 holes of 12mm across 27 metres of ICD screen. We treated the restriction points: +53% production,...
Learn More