Case Studies
The energy industry is becoming more innovative by the day — from how wells are drilled, to how those wells are produced, to how that product is refined and sent to market.
Our BLUESPARK® technology has far-reaching applications throughout the lifecycle of a well across the energy sector, including Hydrocarbon and Geothermal. Learn how Blue Spark Energy and our clients are part of the energy evolution.
Search by Region
Africa | Asia Pacific | Canada East | Canada West | Continental Europe | Middle East | North Sea | USA California | USA Mid-Continent | USA Permian
Search by Application
Chemical Treatment | Injection Well | New Well | Open Hole | Producing Well | Scale Removal | P&A
Search by Well Type
Vertical | Deviated | Horizontal | Offshore Platform | Geothermal
MENA-IW-154 (Middle East)
The salt-water injection well was cleaned of formation damage due to fines and sludge, resulting in an increase in the injection rate of 175% while reducing CO2 emissions. The oil production of the field also increased.
NSEA-PW-152 (Norweigan North Sea)
The BaSO4 scale was removed from the sand screens by BLUESPARK®, resulting in an increase in oil production of 175%
NSEA-SR-151 (Danish North Sea)
The SCSSSV scale was removed by BLUESPARK®, resulting in a successful inflow test and no need for an insert valve
APAC-PW-143 (Asia Pacific)
BLUESPARK® stimulation to improve connectivity to the reservoir by clearing out blockages resulted in a 3x increase in oil production with the job completed in less than 3 days.
SSA-IW-141 (West Africa)
Instantaneous reduction in injection pressure by 55%, and an injection rate increase by 1,260% after BlueSpark® treatment.
MENA-PW-138 (Middle East)
The aggregate oil production for the first 30-days averaged 324 BOPD, up 970% from the pre-BLUESPARK® aggregate of 30.3 BOPD, including one well (Well #4) that had zero production pre-treatment.
MENA-PW-137 (Middle East)
A 60% aggregate increase in oil production for two wells was completed in less than two days.
NSEA-SR-135 (North Sea)
An increase in control line returns was noted after the first BLUESPARK® run, indicating the flow tube and flapper were reactivated. A successful inflow test was performed on the SSSV after the 2nd run.